Quality Assessment of Construction Schedules

  • Roman Marcinkowski
Keywords: no keywords

Abstract

Preparing a schedule is a creative activity. Depending on the planner’s imagination and inventiveness different visions of the plan of the same project are created. At this stage it is worth asking which plan is the best, with which scenario for the works execution the effect of the contractor’s construction operation is the most desirable. This article presents a formalized method of construction schedules’ quality assessment. Its methodical basis is constituted by the model of production scheduling process in a construction execution unit. The assessment of schedules is referred to the absolute scale (in interval 0,1) and is objectified using the costs of realization means outage.

Author Biography

Roman Marcinkowski

Institute of Military Engineering, Military University of Technology, Warsaw, Poland

Published
2003-03-31
How to Cite
Marcinkowski, R. (2003). Quality Assessment of Construction Schedules. Communications - Scientific Letters of the University of Zilina, 5(1), 76-83. Retrieved from http://journals.uniza.sk/index.php/communications/article/view/1342
Section
Articles