[1]
Izvolt, L., Harusinec, J. and Smalo, M. 2018. Optimisation of Transition Areas between Ballastless Track and Ballasted Track in the Area of the Tunnel Turecky Vrch. Communications - Scientific letters of the University of Zilina. 20, 3 (Sep. 2018), 67-76. DOI:https://doi.org/10.26552/com.C.2018.3.67-76.